(303) 885-1315
Main Office – Highlands Ranch
The Process
In Cordillera, Altitude Athletic Surfaces delivered six pickleball courts and a tennis court, giving the community a dedicated racquet sports facility in the Vail Valley. A project like this typically includes removing the old surface, base preparation, a new court slab, surfacing, and separate striping for tennis and pickleball.
Planning tennis, pickleball or both for your community? Request a free consultation to find the right layout for your site.
Requirements
A combined tennis and pickleball facility calls for:
Time frame
Mountain construction runs from late spring to early fall. A multi-court facility is sequenced so each phase, from base work to surfacing, finishes inside that window, with cure time for the concrete before the playing surface goes on.
Hurdles
Fitting two sports into one site means balancing court count, spacing and player flow. At elevation, the build also has to account for cold nights, intense UV and long winters. Altitude plans the layout and schedule around both.
Main Office – Highlands Ranch
Get a Custom Quote
Locally Owned and Operated