(303) 885-1315
Main Office – Highlands Ranch
The Process
For Mission Viejo, Altitude Athletic Surfaces delivered a 16-court pickleball complex built for big crowds and consistent play. A complex build typically includes site layout, base preparation, new court slabs, surfacing, regulation striping and nets on every court.
Planning a large pickleball facility or tournament venue? Request a free consultation to talk through layout, phasing and budget.
Requirements
Large complexes are built in a planned sequence, with base work, slabs and surfacing moving across the site in phases. Cure time for the concrete is built into the schedule before surfacing begins.
Time frame
Large complexes are built in a planned sequence, with base work, slabs and surfacing moving across the site in phases. Cure time for the concrete is built into the schedule before surfacing begins.
Hurdles
At this scale, small variations add up. Water has to move off a large surface without pooling between courts, and lines have to match on all 16. Altitude manages grading, layout and quality control across the full site so the complex plays as one facility.
Main Office – Highlands Ranch
Get a Custom Quote
Locally Owned and Operated
At Altitude Athletic Surfaces, LLC, our priority is to provide high-quality work and finish our projects on time, every single time. Our work remains consistent from start to finish, and we make it a point to deliver exactly what was promised.
Proud Members of

